A poorly installed driveway can cause numerous issues which is why from the subbase to the surface instalment following a few steps can help protect your new driveway from issues such as cracks, pooling, and deterioration. Using a professional driveway installer will ensure that the driveway will follow all regulations and ensure that it can withstand the usage it is designed for.
The stages for installation of a tarmac driveway installation must be precisely followed to ensure longevity. These stages include an initial assessment of the site. Excavation, subbase preparations, edging, drainage, binder application, course laying and compaction.
The stages must be completed each thoroughly and to a high standard to have the best and most durable outcome of the driveway possible.
Assessment and Planning:
The first step is the groundwork and surveys to ensure that we know any potential issues, the drainage situation and the soil components. We will measure and work out how much tarmac is needed. We will assess if any planning is needed and assess the weather forecast. The best months are Mat to October for optimal curing of tarmac driveways.
Excavation and preparation:
The foundations of the tarmac driveway will be determined by the excavation the existing surface is removed along with any debris. The depth of exaction is usually 200-250mm. If the soil contains a lot of clay, your additional additives may be needed to stop water retention.
Edge restraints:
The edge restraints are then added for structural support and boundaries. Concrete edges, kerbstones and timber frames can be used. The restraints help to stop the driveway losing shape and withstand the pressure the tarmac will be under.
Subbase installation and compaction:
Subbases help to form the load bearing foundation of the driveway. There is a minimum layer of 150mm MOT Type 1 aggregate to ensure stability. The aggregate is layed and compacted to ensure a uniform base layer.
Drainage:
Building regulations state that the drainage for non-permeable driveways when exceeding 5mm. These drainage solutions help to ensure non pooling of surface water. Channel drains, French drains and soakaways help to ensure the water is directed away from the surface of the tarmac driveway.
Binder course:
The binder course will provide the primary structural strength from subbases to the surface the hot mix will be between 50-70mm thick. The temperature of the binder course is between 105 and 145 degrees. The compaction is completed immediately before the cooling process starts.
Wearing course:
The wearing course is the final surface of the driveway which will be exposed to vehicles and weather. The application is done straight from the binding course and when cooled but before the tarmac is fully cured.
Final compaction:
Compaction helps to remove air voids and ensures that the density remains throughout the tarmac layers. Compaction is usually carried out with rollers and then sealed. The tarmac should be left 24-48 hours before it is ready for use.
If you have a need for a tar5mac driveway Allmac can help ensure from subbase to surface each step of the way is carried out with precision and quality.