If you are tarmacking a surface that requires access to not be affected, then there are various methods we can look at here at Allmac to ensure that access of not affected. To do this it is necessary to ensure a full, comprehensive plan is executed. This is done by working out sectional areas to tarmac and expert skills, which luckily Allmac are renowned for.
A few methods we adopt when tarmacking without shutting down access are detailed below.
First up is the split lane phasing method. This method is used when driveways or private roads need resurfacing and access is still required. We do this by working on one half of the surface while the other half is still being used for access. First the excavation, prep and tarmac is done one side whilst keeping the other in full use with traffic flow restrictions in place. One the tarmac is dried which is anywhere from 2-24 hours the process is repeated for the other side.
Another approach we use to tarmac without restricting access is the checkerboard method. This is best for narrow pathways or turning points. The area is all prepped as usual for a tarmac lay and then the tarmac is completed in sections like a checkerboard. Steel road plates are used over the tarmac to ensure immediate access.
Another approach we adopt when we can is using fast drying or even cold laying solutions. Cold lay asphalt is immediately set and can be driven on straight away but only is used for small areas. Another option is to add rapid cure polymers to ensure that the tarmac can be used after just a couple of hours. Its also useful to be aware that compacted aggregate is also safe to drive on so the prep can be completed and access remain fully functional if the aggregate is correctly compacted.
If you have a need for fully accessibility but also require tarmac services, then Allmac can help. Contact us today for more information.